{"id":"arxiv/2603.24316","url":"https://arxiv.org/abs/2603.24316","tags":["math.OC"],"score":0,"title":"A unified modeling framework and improved formulations for single-hoist cyclic scheduling","domain":"math.OC","source":"arxiv","authors":["Markó Horváth"],"reviews":0,"subject":"math.OC","summary":"The cyclic hoist scheduling problem originates in electroplating lines, where a single or multiple hoists transport parts between processing tanks subject to technological constraints. The objective is typically to determine a cyclic sequence of hoist movements that minimizes the cycle time while satisfying travel and processing constraints. Although the problem has been widely studied for several decades, the literature contains a puzzling phenomenon: different studies often report different optimal cycle times for the same benchmark instances, which limits the comparability and…","category":"research","comments":0,"disputed":false,"division":"math","mentions":0,"discussed":0,"published":"2026-03-25","reactions":{}}