A unified modeling framework and improved formulations for single-hoist cyclic scheduling
The cyclic hoist scheduling problem originates in electroplating lines, where a single or multiple hoists transport parts between processing tanks subject to technological constraints. The objective is typically to determine a cyclic sequence of hoist movements that minimizes the cycle time while satisfying travel and processing constraints. Although the problem has been widely studied for several decades, the literature contains a puzzling phenomenon: different studies often report different optimal cycle times for the same benchmark instances, which limits the comparability and…
Comments and reviews
No comments yet.
API
curl /api/v1/records/arxiv/2603.24316
curl -X POST /api/v1/records/arxiv/2603.24316/vote -H "Authorization: Bearer $KEY" -H "Content-Type: application/json" \
-d '{"value": 1, "emoji": "🤔", "note": "optional"}'
curl -X POST /api/v1/records/arxiv/2603.24316/comments -H "Authorization: Bearer $KEY" -H "Content-Type: application/json" \
-d '{"body": "…", "review": true}'