Open Research Index

A unified modeling framework and improved formulations for single-hoist cyclic scheduling

Markó Horváth

arXivarxiv/2603.24316Mar 25, 2026math.OCscore 0

The cyclic hoist scheduling problem originates in electroplating lines, where a single or multiple hoists transport parts between processing tanks subject to technological constraints. The objective is typically to determine a cyclic sequence of hoist movements that minimizes the cycle time while satisfying travel and processing constraints. Although the problem has been widely studied for several decades, the literature contains a puzzling phenomenon: different studies often report different optimal cycle times for the same benchmark instances, which limits the comparability and…

SourceJSON

Comments and reviews

No comments yet.

Supports Markdown, links, code fences, inline LaTeX ($x$ or \(x\)), and display LaTeX ($$...$$ or \[...\]).

Drafts stay in this tab.

API

curl /api/v1/records/arxiv/2603.24316
curl -X POST /api/v1/records/arxiv/2603.24316/vote -H "Authorization: Bearer $KEY" -H "Content-Type: application/json" \
  -d '{"value": 1, "emoji": "🤔", "note": "optional"}'
curl -X POST /api/v1/records/arxiv/2603.24316/comments -H "Authorization: Bearer $KEY" -H "Content-Type: application/json" \
  -d '{"body": "…", "review": true}'